TOPs Site Index

Thursday, December 13, 2012

OPSEC, The 9/11 Operation, and the “DAMS” process (continued:) Link Updated 02.26.2015

By Donald F. Truax - Posting #213 - The 9/11 Operation

Senator, to continue, if one does a chronological overlay of U.S. Govt. policy starting in 1992 through 2001 the 9/11 Operation comes into clear view with respect to the DAMS five discreet phases as shown below. For emphasis, OPSEC P111 list it somewhat different, but, the point here is that OPSEC operations and it's doctrine are what allows the government to run SCADs operations covertly hidden from public view designed with “plausible denial-ability” via compartmentalized components that keep each component of the operation separate should anyone ever try to reverse engineer the said operation.



p.14-#8 states: Effectively obtaining these goods and services ofter "requires effective management of a complex acquisition system encompassing the design, engineering, construction, testing, deployment, sustainment, and disposal of weapons or related items acquired under contract".

The DoD Joint Capabilities Integration and Development System (JCIDS) identifies and validates DoD capability requirements through a document known as the Initial Capabilities Document (ICD)

The Defense Acquisition Management System (DAMS) seeks out the best material acquisition alternatives and strategies for fulfilling the ICD requirement communicated by the JCIDS in accordance with the law (FAR DoDI 5000.1/5000.2)

The DOD Acquisition Management System (DAMS); DAMS consist of five "discreet phases":

In 1986 SAIC performed a "security" assessment of the World Trade Center Complex that would have encompassed a review of the structural stress-points of the World Trade Center buildings. Effectively, this specific information would have been pertinent in developing, designing, and engineering a controlled demolition (to include munitions) that would have been both effective and successful in bringing down such structures as the World Trade Center buildings in their "own footprint" in under ten (10) seconds.

The designing, engineering and construction of demolitions for the 9/11 operation against the World Trade Center Complex:
0. World Trade Center Security Assessments: SAIC World Trade Center Security Assessments

The testing of munitions against the structural foundation of the World Trade Center Complex:


The deployment and sustainment of developed weapons for the controlled demolitions of the World Trade Center Complex:
2. Technology Development Phase (TD): SAIC World Trade Center Upgrades 1993 - 2002
3. Engineering and Manufacturing Development Phase (EMD): SAIC World Trade Center Upgrades 1993 - 2002
4. Production and Deployment Phase (PD): SAIC World Trade Center Upgrades 1993 - 2002

The execution of the 9/11 operation and disposal of developed weapons used in the controlled demolition of the World Trade Center complex:


WAKE UP AMERICA!!!....Its "OUR" country!!!

Love "Light" and Energy

_Don

No comments:

Post a Comment

Your Feedback is welcomed :-)

Love "Light" and Energy

_Don

Note: Only a member of this blog may post a comment.