Senator,
to continue, if one does a chronological overlay of U.S.
Govt. policy starting in 1992 through 2001 the 9/11 Operation comes into clear view with respect to the DAMS five discreet phases
as shown below. For emphasis, OPSEC P111 list it somewhat different,
but, the point here is that OPSEC operations and it's doctrine are
what allows the government to run SCADs operations covertly hidden
from public view designed with “plausible denial-ability” via
compartmentalized components that keep each component of the
operation separate should anyone ever try to reverse engineer the
said operation.
p.14-#8
states: Effectively obtaining these goods and services ofter
"requires effective management of a
complex acquisition system encompassing the design, engineering,
construction, testing, deployment, sustainment, and disposal of
weapons or related items acquired under contract".
The
DoD Joint Capabilities Integration and Development System (JCIDS)
identifies and validates DoD capability requirements through a
document known as the Initial Capabilities Document (ICD)
The
Defense Acquisition Management System (DAMS) seeks out the best
material acquisition alternatives and strategies for fulfilling the
ICD requirement communicated by the JCIDS in accordance with the law
(FAR DoDI 5000.1/5000.2)
The
DOD Acquisition Management System (DAMS); DAMS consist of five
"discreet phases":
In
1986 SAIC performed a "security" assessment of the World
Trade Center Complex that would have encompassed a review of the
structural stress-points of the World Trade Center buildings.
Effectively, this specific information would have been pertinent in
developing, designing, and engineering a controlled demolition (to
include munitions) that would have been both effective and successful
in bringing down such structures as the World Trade Center buildings
in their "own footprint" in under ten (10) seconds.
The
designing, engineering
and construction of demolitions for the 9/11 operation against the
World Trade Center Complex:
0.
World Trade Center Security Assessments: SAIC
World Trade Center Security Assessments
The
testing of munitions against the structural foundation of the World
Trade Center Complex:
The
deployment and sustainment of developed weapons for the controlled
demolitions of the World Trade Center Complex:
2.
Technology Development Phase (TD): SAIC
World Trade Center Upgrades 1993 - 2002
3.
Engineering
and Manufacturing Development Phase (EMD): SAIC
World Trade Center Upgrades 1993 - 2002
4.
Production and Deployment Phase (PD): SAIC
World Trade Center Upgrades 1993 - 2002
The
execution
of the 9/11 operation and disposal of developed weapons used in
the controlled demolition of the World Trade Center complex:
5.
Operations
and Maintenance Phase (OM): SAIC
City Time Payroll Project
- SAIC
at ground “0” on the morning of 9/11
WAKE UP
AMERICA!!!....Its "OUR" country!!!
Love
"Light" and Energy
_Don
References:
Prevent the Reemergence of a New Rival
Prevent the Reemergence of a New Rival
U.S.
Government - SAIC Blast Analysis of WTC prior 911
SAIC 1993 World Trade Center Blast Analysis
SAIC World Trade Center Upgrades 1993 - 2002
SAIC World Trade Center Upgrades 1993 - 2002
SAIC World Trade Center Upgrades 1993 - 2002
The 9/11 Stand Down
SAIC CityTime Corruption Case
The New Mobile Infantry
SAIC 1993 World Trade Center Blast Analysis
SAIC World Trade Center Upgrades 1993 - 2002
SAIC World Trade Center Upgrades 1993 - 2002
SAIC World Trade Center Upgrades 1993 - 2002
The 9/11 Stand Down
SAIC CityTime Corruption Case
The New Mobile Infantry
No comments:
Post a Comment
Your Feedback is welcomed :-)
Love "Light" and Energy
_Don
Note: Only a member of this blog may post a comment.